| 1. Cut hole
through insulation cladding with hole saw the size of
which corresponds with the plug size to be installed.
|
2. Remove insulation and clean external
surfaces. Retain insulation removed for use later. |
3. Using both hands, stretch rubber
'O' ring over the eyelet. |
4. Insert eyelet (with 'O' ring fitted)
into the pre-cut hole in the insulation cladding. |
| 5. Insert the hydraulic
tool into eyelet. Close the valve on the tool. Make sure
the tool is level. Pump handle approx 5 times Open valve.
Remove tool. |
6. Re-insert insulation into hole.
Using both hands, insert I.I.P Port plug into hole. |
7. Make sure plug is fully seated by
depressing centre of plug firmly with thumb. |
8. Plug is now correctly installed
and ready for periodic inspection of the substrate. |